
Why choose us
Why building managers choose us, and when we are not the right fit.
Choosing a cleaning company is mostly about what happens after the first month. This page shows what to compare between contractors, the warning signs to watch for, and how we handle each point.
- Written plan before you sign
- The same crew every visit
- Supervisor inspections
- No hidden extras
Compare before you sign
Ten points to compare between cleaning companies
Ask every company you are considering about these points, us included. The answers say more about the next twelve months than any price.
| What to compare | Why it matters | What we do |
|---|---|---|
| Written scope | Without a list of tasks, nobody can say what was missed. | A task sheet by area, signed before the start |
| Who cleans | Rotating staff means relearning your building every week. | A crew assigned to your site |
| Supervision | Work that is never checked slowly gets worse. | A named supervisor who inspects |
| When something is missed | The real test of a contractor is how fast problems are fixed. | Corrected within 24 business hours |
| Extra work | Vague contracts lead to surprise invoices. | Priced and approved before it is done |
| Insurance | You need proof, not a promise, before giving access to your building. | Certificate sent before the first visit |
| Products | People work, eat and wait in the spaces being cleaned. | Low-VOC products, data sheets on request |
| Point of contact | Calling a general line every time wastes your time. | Direct access to your supervisor |
| Schedule | Cleaning during business hours disrupts staff and clients. | Evening, overnight or early morning |
| Language | Instructions get lost when the team does not understand them. | Service in English and French |
Warning signs
Six signs a cleaning quote will cost you more later
None of these means a company is dishonest. But each one tends to show up later as missed tasks, extra fees or a contract that is hard to manage.
01A price without a visit
Nobody can price a building accurately without seeing its washrooms, floors and traffic.
02“Everything included”
If the tasks are not listed, you cannot know what you are actually paying for.
03No name for the crew
If they cannot say who will clean your building, expect a different team each week.
04Insurance “on request, later”
A serious company sends its certificate before starting, without being chased.
05Only an hourly rate
An hourly rate says nothing about how much gets done in that hour.
06No one to call
When something is missed, you should reach a person responsible for your site, not a voicemail.
Honest answer
When we are probably not the right choice
We would rather tell you now than lose your trust in three months.
You are choosing only on price per visit
Our price includes supervision, inspections and a stable crew. If those do not matter to you, a cheaper option will exist.
Your site is outside our supervision area
If our supervisors cannot reach your building regularly, we tell you before quoting instead of promising something we cannot follow.
You need a service we do not offer
We say so clearly. Our services are listed on one page, so you can check before calling.
All servicesChanging contractors
Switching to us without a gap in service
Most of our clients came from another company. The change is planned so your building is never left uncleaned between the two.
Plan the switch
- ✓
The start date matches the end of your current contract
You give notice when it suits you. We plan our first visit for the day after.
- ✓
Access is settled before day one
Keys, cards, alarm codes and restricted areas are confirmed and written into the plan.
- ✓
The first weeks are inspected closely
Your supervisor checks the building against the plan early, while the crew is learning it.
- ✓
A review after the first month
We go over what works and adjust frequencies where needed.
01How do I compare two cleaning quotes fairly?
Put the task lists side by side, not just the prices. Check what each quote includes in every area, how often each task is done, who supervises the work and how extra work is billed. A cheaper quote often simply includes fewer tasks.
02Can we switch cleaning companies in the middle of a contract?
It depends on the notice period in your current agreement. We plan our start date to follow the end of your notice, so there is no gap in cleaning between the two companies.
03What should we ask for before signing with any cleaning company?
An insurance certificate, a written task list for your building, the name of the person responsible for your site, and how missed tasks and extra work are handled. A reliable company provides all four without hesitation.
Put us to the test with a free visit
Ask us the ten questions above during the visit. You will receive a written plan and price within 48 business hours, and you decide afterwards.